Jump to content

Feature request


Recommended Posts

But GW and FOB are dynamic, so they change during the flight. This is flight phase EFB covers. ZFW and LOAD are needed for planning, as Oski mentioned, and they are fix. EFB doesn't aim to cover this phase of preparation, hence the values are not needed. The only situation that comes into my mind where load would change in-flight, is for parachute or fire fighting. ?

Link to comment
Share on other sites

47 minutes ago, Mr. ATC said:

But GW and FOB are dynamic, so they change during the flight. This is flight phase EFB covers. ZFW and LOAD are needed for planning, as Oski mentioned, and they are fix. EFB doesn't aim to cover this phase of preparation, hence the values are not needed. The only situation that comes into my mind where load would change in-flight, is for parachute or fire fighting. ?

correct ?

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...